Norquay Construction Site

September 25, 2000 - the finishing work begins


The foreman - Mr. Neil Willis



at the bottom of the main stairs 

at the top of the back stairs

How can you tell that this room is on the top floor?

How can you tell that this room is on the bottom floor?

in the boiler room

See the insulation in the rafters.

one of the washrooms